Cheney WTRP Main Distribution

Project Overview

Replaced 2000-amp main service, power distribution center, and automatic transfer switch while maintaining plant operations.

Cheney WTRP Final Treatment

1) Installed underground conduit system for all controls, instrumentation, and power distribution.

2) Installed two 400-amp load redundant centers to care for 6500 square foot final treatment building.

3) Installed and commissioned all PLC and instrumentation control systems.